TENNESSEE TITANS STADIUM

The BIM Engineers played a pivotal role in the design development phase of the Tennessee Titans Stadium, utilizing advanced BIM methodologies. The primary focus was on clash detection, ensuring seamless coordination among various design elements and the creation of clash-free construction and fabrication drawings.

    Key Details

  • Project Area: 435,000 SF
  • Country Name: United States
  • Scope: Design Development using Building Information Modeling (BIM) Clash Detection, Coordination, and Clash-Free Construction/Fabrication Drawings.
  • LOD: 400
  • Softwares: Revit, AutoCAD, Navisworks, BIM-360, Dynamo