PROGRESSIVE FIELD STADIUM

The BIM Engineers played a pivotal role in advancing the design development of Progressive Field Stadium, employing state-of-the-art Building Information Modeling (BIM) techniques. The primary objectives included clash detection, ensuring coordination among various design elements, and the creation of clash-free construction and fabrication drawings.

    Key Details

  • Project Area: 285,000 SF
  • Country Name: United States
  • Scope: Design Development using Building Information Modeling (BIM) Clash Detection, Coordination, and Clash-Free Construction/Fabrication Drawings.
  • LOD: 400
  • Services: BIM/VDC
  • Softwares: Revit, AutoCAD, Navisworks, BIM-360, Dynamo